Following are highlights from selected Transtoll installations.
Herrentunnel System, Germany
The Herrentunnel Luebeck Gmbh and Co KG (HLKG) transport infrastructure consortium chose Transtoll to deliver a hi-tech sophisticated toll collection solution for the 10-lane Herrentunnel under the River Trave in Lübeck, Germany.
Transtoll were awarded the contract for the supply of a Multi-Lane Free-Flow electronic toll collection system for the Lane Cove Tunnel project in Sydney, Australia, consisting of two 3.6 kilometre dual carriage road tunnels.